INSPECTOR HOURS: 7:30AM- 4:30PM

DRAWING REQUIREMENTS: Beginning January 1, 2016 paper copies will not be required at time of permit issuance for City retention if the original submittal has all necessary design stamps and signatures at time of electronic submittal. A set of approved drawings with City stamps will need to be printed in color and kept on site for inspections

ROOFING INSPECTIONS: Beginning November 30, 2015 roofing inspections will be required on all residential and non-residential new buildings as well as additions, patio covers, patio enclosures etc. This will include dry-in flashing inspection as well as a final roof inspection. You do not need to leave a ladder onsite for this as the inspection takes place from the ground.