Long Range Planning

Print
Press Enter to show all options, press Tab go to next option

The Department of Public Works is responsible for developing and maintaining a variety of master plans and reports for our community.  Copies of the complete plans can be found below.

2035 Transportation Master Plan

Complete 2035 Transportation Plan  [PDF]

•Section 1: Purpose & Process [PDF]
•Section 2: Draft Community Sustainability Plan [PDF]
•Section 3: Overview of Exisiting System [PDF]
•Section 4: Change 2000 to 2012 [PDF]
•Section 5: 2035 Analysis and Projections [PDF]
•Section 6: Financial Plan [PDF]
•Section 7: 2035 Fiscally Constrained Plan [PDF]
•Section 8: Performance Measures for Plan Success [PDF] 
•Section 9: Recommendations [PDF]  

2035 Street Plan [PDF]

2035 Street Buildout Plan [PDF]

Budgeted Capital Improvement Projects [Link to Budget book]

Transit Master Plan

Transit Plan [PDF]

Bike and Pedestrian Plan

Bike and Pedestrian Plan [PDF]

Intelligent Transportation Systems (ITS)

ITS Progress Report [PDF]

Railroad Quiet Zone

Quiet Zone Corridors Report [PDF]

Downtown Master Plan

HIP Streets (Heart Improvement Projects) Master Plan [PDF]

Boise Avenue Corridor

Boise Avenue Corridor Study Report [PDF]

Facilities Master Plan

Facilities Master Plan [PDF]

Stormwater Master Plan

1986 Stormwater Master Plan - Volume I [PDF]

1986 Stormwater Master Plan - Volume II (Drawings) [PDF]

Land Acquisition Process

Land Acquisition Process [PDF]

Relocation Program [PDF]

Public Works Strategic Plan

Strategic Plan [PDF]

Annual Reports

2013 Annual Report [PDF]

2012 Annual Report [PDF]

2011 Annual Report [PDF]

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer